Business setup in Dubai mainland: why a restaurant needs a mainland LLC
A restaurant is a physical venue with guests, a kitchen and staff. For that reason mainland company formation in Dubai as an LLC is the usual route. The Department of Economy and Tourism (DET) issues the licence for a restaurant or cafe activity.
A free zone licence generally lets you operate only within that zone, while a restaurant has to be where the guests are: in a residential area, on a promenade or in a mall. You also need a full operating company to hire staff and run the venue.
Freelance visas exist, but they make it hard to open a corporate bank account and do not let you build a team. For a cafe this is rarely workable.
On the question of a local sponsor: when this article was prepared, a mainland LLC could be owned 100% by the investor without a local partner. The rules have changed in the past, so check the current position on u.ae and with DET before you sign anything.
How to get a business license in Dubai: the order of steps
The licence and the tenancy depend on each other. You cannot get a licence without a lease, and you cannot register a lease without a company. In practice, once the LLC registration is confirmed, you can sign the lease and register it in the Ejari system.
- Company name. It must be unique and not already on the register.
- LLC registration and the memorandum of association (MOA). The MOA records the shareholders, their shares and the activity.
- Tenancy and Ejari. The lease is signed in the company's name and registered, and the premises become the registered address.
- Licence from the Department of Economy. For food service it is tied to a physical location.
- Emirates ID. It is issued on the strength of the company: biometrics first, then the physical card.
- Employee visas. The owner's visa comes first, then those of the staff.
One practical point: to file the LLC application, an Emirates ID or a local assistant using their own ID has typically been needed. This practice may have changed, so confirm it before starting. If you are abroad, many steps can be handled by power of attorney.
The validity of the owner's residence visa has also varied. It used to be 3 years and, at the time of writing, was 2 years. Check the current terms with ICP/GDRFA.
Renting commercial premises for a restaurant and registering Ejari
Finding premises is often the longest stage, because not every unit can take a kitchen. Write your technical brief first: floor area, electrical load, extraction, wet point and footfall.
Points to know about commercial leasing:
- the lease is arranged through a licensed broker, and dealing directly with the landlord is generally not how it works;
- in commercial leasing the tenant normally pays the brokerage fee;
- the security deposit ranges from 5% to 25% of annual rent;
- rent is usually paid a year ahead by post-dated cheques;
- terms typically run from one to five years, and a restaurant benefits from a longer term because you invest in the fit-out.
The lease and its annexes should set out termination, eviction and penalty terms. A standard form will not cover every risk for the tenant. Operators often cite a legal cap of 5% on rent increases, but for commercial units you should check the rules in force and the contract wording.
You may also come across "key money": buying the outgoing tenant's existing lease together with the fit-out, services and some equipment. It can speed up the launch, but the price needs the same scrutiny as the rent itself.
DEWA, fire service and municipality approvals
After you take the unit, the least predictable stage begins: approval of the project. Changes to services need sign-off from three separate bodies.
| Body | What is approved |
|---|---|
| DEWA | Electricity and water, and any alterations to services |
| Fire service | Fire-safety solutions; a separate authority, needed when layouts or equipment positions change |
| Municipality | Drawings, equipment, furniture layout, circulation space, signage |
You cannot open until the inspections are passed, but rent is already payable. When signing, negotiate a rent-free period for the approval stage. Specific requirements and filing routes can change, so confirm them with the authorities and on u.ae.
If the unit was previously a food outlet, some services may already be in place. Even so, any addition, such as extraction, plumbing or filters, needs fresh approval.
Premises and kitchen requirements
Benchmarks cited by operators for a kitchen with hot production (verify current standards for your format):
- area: from about 400 sq ft;
- electrical capacity: around 15 kW, where the equipment alone (coffee machine, cooking line, refrigeration) can take 10–12 kW;
- extraction and fresh-air supply;
- a mandatory wet point with water and drainage;
- hot water typically provided by boilers.
Check the air conditioning separately. In the heat, a system sized for an ordinary office may not cope with a kitchen, and extra extraction motors, ducting and another AC unit are sometimes needed. A trial run and test cooking before filing help to spot this early.
Service contracts are easy to overlook. The grease trap, oil changes, hood cleaning and pest control are all checked, so they belong in your financial model.
Signage and landlord approval
Signage is approved twice: by the municipality and by the building owner or developer. If your sign hangs on a façade controlled by a large developer, its consent is needed as well. Even with a previous tenant's sign already up, changing it to your brand can take about a month, and you trade without a sign in the meantime.
Run the signage approval in parallel with the other steps, not after them.
Outdoor promotion has limits too. Handing out leaflets in the street is treated as distribution and, according to operators, is not permitted. You can invite guests only at your own frontage. If you plan paid social advertising, a local ad account may be required. Check this, together with your licensed activities, before launch.
Staff visas and the corporate bank account
The employer arranges and pays for the visa, Emirates ID and health insurance. As a rough guide at the time of writing, this is about AED 7,500–9,000 per employee for 2 years, depending on category. Add it up for the whole team when calculating payback.
Contracts often include a probation period of up to 6 months. If the employee leaves earlier, they repay the costs; after that they do not, and a new visa has to be processed for a replacement.
A corporate account cannot be opened without an Emirates ID. Banks have tightened their checks, and for applicants from CIS countries the process has taken up to six months, because the bank wants to confirm the business is real and operating. Build this into your schedule and prepare a full pack: lease, licence and a business description.
Inspections after opening
Unplanned inspections can follow, sometimes covering a whole district venue by venue. Operators report that the first can arrive within a week of opening. Inspectors look at:
- staff visas and registration;
- service contracts for the kitchen and extraction;
- temperature control and labelling;
- cleanliness of premises and equipment.
For minor findings you are usually given time to fix them. Missing staff visas are a far more serious matter. Orderly paperwork and consistent hygiene routines are the best preparation for an inspection.
How long does it take to launch a restaurant in Dubai?
There is no fixed timeline. It depends on the property search, the condition of the services, approval queues and bank speed. In the example below, about five months, from late March to September, went on premises search, registration, fit-out and approvals. That is viewed as fairly quick for Dubai.
| Stage | Depends on |
|---|---|
| Premises search | Your brief, brokers, availability of ready kitchens |
| LLC registration and Ejari | Complete documents, filing method |
| DEWA, fire service, municipality | Scale of alterations, queues, comments |
| Signage | Landlord's consent |
| Bank account | Bank checks, Emirates ID |
Real-world example
Situation. An entrepreneur from Russia with no local partner wanted to open a small quick-service venue in Dubai and own the company outright.
What was done. A unique name was chosen, a mainland LLC was registered and a licence for the "restaurant" activity was obtained. A lease was signed (Ejari) for premises with existing services, an Emirates ID was issued through the company, and visas were arranged for staff. Drawings were then approved by DEWA, the fire service and the municipality, with extra extraction and plumbing added.
Outcome. The owner holds the company fully, the licence was issued and the venue opened in September, about five months after the active search began. The sign was approved later, so trading ran about a month without it. This is an anonymised situation from public sources, not a result achieved by our firm.
Common mistakes when opening a cafe or restaurant
- Signing the lease before checking the kitchen. Power, extraction and cooling problems surface too late.
- No rent-free period. Rent runs while you cannot open.
- Leaving signage until last. Landlord approval takes time.
- Hiring a random "fixer". A cheap offer without a contract often costs more and takes longer, and sometimes the intermediary disappears.
- Leaving visas and insurance out of the budget. Staff costs are large and arrive early.
- Expecting a quick bank account. Checks on CIS-linked companies can be lengthy.
- Leafleting in the street. It is treated as distribution.
- A short lease after a costly fit-out. You can lose the unit along with your investment.
How we can help
We are the lawyers of ALROA Legal Consultancy (licence No. 20474/2026, DET). We help you choose the right structure and activity for your venue and prepare the registration documents.
- Mainland company setup in Dubai: structuring and filing.
- Trade licence: activity, link to premises, renewal.
- LLC in the UAE: articles, shares, management.
- Licensed activities: choosing the right code for food service.
We work remotely under power of attorney. A one-off consultation starts from AED 750 for 60 minutes (credited if you sign a contract). A fixed-price project starts from AED 5,000; government fees and translations are paid separately and listed in the estimate. See pricing or get in touch via contacts.
This article is for information only and is not a substitute for advice. Requirements change: before you start, check them on u.ae and with DET, DEWA, the municipality and ICP/GDRFA.
FAQ
A Department of Economy and Tourism licence for a food-service activity (such as restaurant) held by an LLC. It is tied to the premises, so a registered tenancy (Ejari) is needed.
A free zone licence generally allows you to operate within that zone. For a venue serving guests in an ordinary district, mainland is usually chosen. Check each zone's rules individually.
At the time of writing, the owner can hold 100% of the company without a local partner. The rules have changed in the past, so confirm the current position on u.ae and with DET.
It depends on the property search, the amount of alteration work and the approvals. In the example above, about five months passed from the active search to opening.
Typically staff visas, service contracts, temperature control, labelling and cleanliness. For minor findings you are normally given time to correct them.
Roughly AED 7,500–9,000 per person for 2 years (visa, Emirates ID, insurance) at the time of writing. The employer pays; check current charges.
This material is for information only and is not legal advice. UAE authorities' rules and requirements change — check the current version before acting.